Grand River Greenways Expansion

The Grand River Greenway Trail will improve nonmotorized access to more than 30 public parks along the Grand River, including, but not limited to, Millennium, Johnson, Dwight Lydell, Rogue River, Pickerel Lake, Chief Hazy Cloud, Lowell Regional, Roselle, and the greenspaces throughout Downtown Grand Rapids. The trail will also link several regionally significant mountain biking trail networks at the Cannonsburg State Game Area, Cannonsburg Recreation and Ski Area, Luton Park, and the new network that is complete at Johnson Park.

New Additions to the Grand River Greenway!

Northland Drive Tunnel

Northland Tunnel

When complete the Northland Drive Tunnel will provide a safer route for people walking and biking across one of the busiest streets in the area. The tunnel connects our new trails from Pettis to Cannonsburg to Northland Dr to the existing Fred Meijer White Pine Trail. Making it an integral part in making the Greenway come to life. Estimated Opening: Fall 2026.

Pettis Trail

Pettis Trail

The new 3.5-mile Pettis Trail will provide a dedicated route separated from vehicle traffic through the rolling hills of Cannon and Ada townships. It will connect the Cannonsburg Trail to Ada Township’s existing trail system at Knapp Street and Pettis Avenue, near Forest Hills Eastern. Construction began in July 2026, with an anticipated opening in winter 2027.

Cannonsburg Trail:

The Cannonsburg Trail will connect Northland Drive to Pettis Avenue through two construction phases:

  • Chauncey Avenue to Pettis Avenue: Construction began in July 2026, with major trail work, including a small bridge over Bear Creek. Expected to finish in late fall 2026.

  • Northland Drive to Chauncey Avenue: Construction is expected to begin by summer 2027. A completion date has not yet been announced.

Once both sections are complete, the Cannonsburg Trail will link the Northland Drive trail and pedestrian tunnel with the Pettis Trail, bringing the region closer to a continuous, connected Greenway

Knapp Street Pedestrian Bridge:

A safer connection across the Grand River is taking shape. The Knapp Street Pedestrian Bridge will provide a dedicated crossing alongside the existing road bridge, separating walkers, runners, and cyclists from vehicle traffic. New connecting paths and boardwalks will link trails in Ada and Grand Rapids townships to the growing Grand River Greenway, expanding opportunities to explore our parks and communities. The bridge is estimated to open in Summer 2027.

Chief Hazy Cloud Park to Roselle Park Suspended Bridge

The proposed park-to-park suspension bridge. When complete, will link Chief Hazy Cloud Park and Roselle Park in Ada, spanning the Grand River and serving as the signature bridge of our trail network, and a landmark crossing for walkers, runners, and cyclists along the Grand River Greenway. Click to donate to the project!

Grand River Greenway Map

Grand River Greenway Trail Expansion Conceptual Plan